Project Location: Colorado Springs
Construction Staking Cost: $445,000
Project Construction Cost: $15 million
Project Start Date: February 2006
Project Completed: November 2007

Peterson Air Force Base
ADAC/G and IMOS Aprons

Edward-James Surveying, Inc. provided complete construction survey staking for the ADAC/G and IMOS Apron Improvements at Peterson Air Force Base.  Abutting our Runway 17L/35R project at Colorado Springs Municipal Airport, this project featured very similar construction and tolerances to the runway, with 14 inches of concrete on top of numerous layers of other material, along with inlets and underdrain.

This project was also performed under very tight time constraints, along with the same strict tolerances that the FAA requires.