I-25 & Eagleridge Interchange
Edward-James Surveying, Inc. provided construction surveying for the
replacement of this major interchange on the north end of Pueblo. This
project included the construction of a 240-foot, 2-span bridge constructed in
three phases to allow the continuous flow of traffic, concrete paving for the
mainline of I-25 and the ramps, reconstruction and widening of Eagleridge
Boulevard to allow multiple lanes of traffic in each direction, drainage
improvements, layout of CDOT right-of-way, and the establishment of new survey
control points upon the completion of the project.